Negotiable
The date of payment from buyers deliver within days
Zhejiang
Long-term effective
2020-11-08 13:32
108
Company Profile
Hangzhou CNCR-IT Co., LtdBy certification [File Integrity]
Contact:hzchuling(Mr.)
Email:
Telephone:
Phone:
Area:Zhejiang
Address:Zhejiang
Website:http://www.cncrinfoaccess.com/ http://hzchuling.gzmscctv.com/
Model
CLEM-C9I2
Feature
1.HomePlug AV standard, Indoor master
2.Using the latest chips in the industry, to achieve 1000Mbps bandwidth
3.Support 1 RF IN, 1 RF OUT Port and 2 FE ports
4.Support DBA, and transmission delay is less than 3ms
5.Work Frequency 975-1170MHz
6. Support WEB, TELNET, SNMP
7. Anti-interference ability is very strong
Advantage of HomePlug AV
◆ Approved by SARFT in China.
◆ Long transmission distance, small link attenuation
◆ High bandwidth, strong stability
◆ Strong anti-interference ability
SPECIFICATION
Property |
Descripotion |
Chip |
MTK2000 |
Work Frequency |
975MHz~1170 MHz |
Output Power |
≥109dBμV |
Receive Sensitivity |
30dBμV |
Physical layer rate |
1500M |
Throughput rate |
1Gpbs(1000Mpbs) |
Work mode at MAC layer |
CSMA/CA, TDMA |
Modulation Mode |
OFDM, QPSK, BPSK |
16/32/64/128/256/512/1024/2048/4096QAM | |
RF Connector |
F type Female socket(English system) |
Eth Connector |
RJ45 |
Output Impedance |
75Ω |
Standard |
IEEE802.3,IEEE802.3af, 10/100/1000Base-T |
Smart bit |
64Byte~1518Byte |
VLAN |
IEEE802.1Q (VLAN lagging) |
Security |
128-bit AES data encryption |
QOS |
Support 802.1P Support the priority number:8 Support different business isolation for different users Support different business isolation for one user Support the isolation between business and software upgrading |
EoC SNMP |
Meet HomePlug AV2 |
Management |
Support SNMP protocol, manage EOC Master and Slave by the remote NMS, local WEB or CLI interface |
Power supply |
60V |
Weight |
<1KG |
Work Temperature |
-20℃~55℃ |
Work humidity |
5%~95% non-condensation |
Power |
<10W |
Relative Humidity |
Less than 95% |
Gas pressure |
70kpa~106kpa |
No causticity gas, no dust, no magnetic field disturb |
Network Diagram
Company Profile
FAQ
Q :How many days will samples be finished? And how about the mass production?
A: Sample leadtime: usually need 7-10days. Mass production leadtime usually need 30-40 days If you can provide the purchase plan in advance, and pay a certain percentage of the deposit, we can do cycle stock for you, to shorten the delivery time
Q:If the products have some quality problem,how will you deal with it?
A: Each step of production and finished products will be inspected by QC department before shipping.If the quality problem of products caused by us, we will provide a replacement service.
Q:Could you provide samples for test?
A: Yes, we provide our customers with samples , but it is not free
Q:How to make payment?
A:T/T,L/C, we also accept most other convenient methods of payment.
http://www.cncrinfoaccess.com/